In 2021, Azienda Agricola Dordoni chose Corradi & Ghisolfi to design and build a 300 kW electric biogas plant. Today, with the same resourcefulness, Luca and Simone Dordoni face a new challenge: the reconversion of the plant to biomethane, with the goal of increasing the producibility to 500 Smc/h, optimizing the use of farm waste and contributing to sustainability.
A project that maximizes the company’s resources and makes a concrete contribution to the energy transition, evolving towards more sustainable production.
Technical characteristics:
Project Type: Biogas Plant Conversion to Biomethane Plant.
Location: Bertonico (LO)
Power: From 300 electric kW to 500 Smc/h (biomethane)
Feed: Livestock manure and silage from intercropping crops
Year of implementation: 2021 (Biogas), reconversion in progress (2025)