REVAMPING OF THE DORDONI AGRICULTURAL COMPANY PLANT – BERTONICO (LO)

At Dordoni Agricultural Company, we are progressing with the construction of a biomethane plant with a production capacity of 500 Sm³/h.

The installation of the technical building is also planned and is currently being prepared at our operational headquarters.

Project Features

  • Type of intervention: Biomethane plant
  • Location: Bertonico (LO)
  • Production capacity: 500 Sm³/h of biomethane
  • Objective: Convert the existing biogas plant into a biomethane production facility