In Bertonico, in the province of Lodi, the conversion of the Società Agricola Dordoni plant has been completed. Originally built in 2021 to generate electricity from biogas, the facility is now a biomethane plant with a production capacity of 500 Sm³/h. In early July 2026, the first cubic metre of biomethane was injected into the gas grid.
The First Biogas Plant Built in 2021
The collaboration between Società Agricola Dordoni and Corradi & Ghisolfi began in 2021 with the construction of a 300 kW biogas plant. The plant mainly used livestock effluents from the farm’s livestock operations, ensiled corn stalks, triticale and second-crop biomass.
During its first year of operation, the plant produced more than 2.3 million kWh and operated for 8,720 hours, excluding maintenance downtime. These results provided the technical basis for evaluating a subsequent transition to biomethane production.
Conversion from Biogas to Biomethane
With the opportunities introduced by the 2022 Biomethane Decree, Dordoni decided to convert the existing plant. The aim of the revamping project was to increase the energy recovery from livestock effluents and agricultural by-products, shifting from electricity generation from biogas to biomethane production for injection into the national gas grid.
Corradi & Ghisolfi developed a coordinated project covering the civil works, biological sections and plant components required to integrate the new units with the existing facilities.
Works Carried Out During the Revamping
The project involved the entire biomass and biogas management line. The main supplies and works included:
- a mixing tank measuring 9 metres in diameter and 4 metres in height;
- a new primary digester measuring 32 metres in diameter and 8 metres in height;
- a covered storage tank with biogas recovery, also measuring 32 metres in diameter and 8 metres in height;
- a bunker silo for biomass storage and a collection pit for leachate;
- a new pump room and new lines for slurry transfer;
- biogas lines, gas bridges and a condensate recovery system;
- upgrades to the electrical system, safety systems and overall plant supervision;
- a digestate separation system and a biochemical desulphurisation tower.
Biomass Feeding and Management
The new feeding system has a capacity of approximately 120 m³ and is designed to handle different substrates and solid feedstocks. The hydraulic push gate and augers convey the biomass to the Biomix pump, which mixes the solid and liquid fractions before feeding them into the digesters.
This configuration allows the feedstocks available on the farm to be managed in a controlled manner while maintaining a consistent feed supply to the biological section.
Mixing, Heating and Gas Recovery
The new digester and the storage tank with gas recovery are equipped with a total of six COMBI MAX 7.0 mixers. The radial and axial movement of the biomass promotes uniform mixing and helps prevent the formation of surface crusts.
Both tanks are equipped with heating systems and double-membrane gas holders. The biogas produced is collected and conveyed through new pipelines, gas bridges and condensate recovery devices to the subsequent treatment sections.
Plant Automation and Supervision
The revamping project also included upgrades to the automation and control network. The centralised supervision system collects the main operating data from the different sections, including flow rates, pressures, temperatures, levels, consumption and any alarms.
Communication with external systems allows operators to monitor the plant in real time, access historical data and coordinate biological production with gas treatment and grid injection.
The First Cubic Metre of Biomethane Injected into the Grid
In early July 2026, the injection of the first cubic metre of biomethane marked the completion of the revamping project and the beginning of the new production phase. The plant can now convert the farm’s organic resources into renewable gas compatible with the national gas grid.
The project valorises livestock effluents and agricultural by-products within an integrated cycle. At the end of the anaerobic digestion process, digestate also remains and can be used for agricultural purposes in accordance with applicable requirements, returning organic matter and nutrients to the soil.
A Project Developed Together
The conversion of the Dordoni plant continues a collaboration that began with biogas and was further strengthened with the transition to biomethane. Corradi & Ghisolfi managed the design, civil works, plant engineering, automation and site coordination, integrating the new sections with the existing plant.
From the first installation in 2021 to the first biomethane injected into the grid, the project demonstrates how an agricultural plant can evolve over time through revamping solutions tailored to the characteristics of the farm and the available feedstocks.